Event Details

Industrial process times are at the core of process improvements. They comprise both manual labor times such as assembly work as well as equipment related times such as set-up or machining times. Process times are key elements of any successful industrial production by forming the basis for costs, wages, and, thus, your product pricing on the market. Since its founding in 1924, the German REFA system has been the most renowned process time management approach worldwide.

工业过程时间是过程改进的核心。它们包括手工劳动时间(如装配工作)和设备相关时间(如安装或加工时间)。过程时间是任何成功的工业生产的关键因素,它构成了成本、工资的基础,因此也构成了产品在市场上的定价。自1924年创立以来,德国的REFA系统一直是世界上最著名的过程时间管理方法。


This workshop illustrates how REFA methods can be used to determine standard times that are realistic and fair for the involved workers, including the determination of contingency allowance times for activities which cannot be planned such as disruptions or personal matters.

本次Workshop将向大家阐释如何使用REFA方法来确定现实且公平的标准时间,包括制定无法预知活动(如中断或个人事项)的应急津贴时间。


We invited Instructor Mr. Dennis Behnke to introduce how German best-practice REFA methods can be applied to increase productivity in manufacturing by analyzing and optimizing process times, allowances, and standard times. In addition, he will also provide hints on how time studies can supplement or substitutepredetermined motion time systems such as MTM.

我们邀请了讲师Dennis Behnke先生为大家介绍,德国最佳实践REFA方法是如何通过分析和优化工艺时间、津贴和标准时间来提高生产效率的。此外,他还将阐释时间研究如何补充或替代预定动作时间标准法(比如MTM)。


Content内容:

  • Background: Legal requirements for process time management in China 中国流程时间管理的法律要求
  • Introduction: What is REFA? 什么是REFA?
  • Time studies vs pre-determined motion time systems (MTM - 1, UAS, etc.) 时间研究 vs. 预定动作时间标准法
  • An overview of REFA core methods and available templates REFA 核心方法和可用模板概述
  • What is a time study and how to carry out a profession time study? 什么是时间研究,如何进行专业时间研究?
  • What are contingency allowances and how to determine them? 什么是应急津贴,如何确定?
  • What is activity sampling and how can it be used to increase productivity? 什么是活动抽样?如何使用它来提高生产率?
  • Other things to consider: An overview of advanced REFA methods 高级REFA方法概述

Agenda:

13:00 – 13:15 Arrival/Registration 签到

13:15 – 13:20 Welcome by German Chamber 德国商会致欢迎词

13:20 – 13:45 Introduction Time Measurement @ KSD Automotive (Mr. Teddy Zhang) 时间测量介绍@长春科世得润汽车部件 (Mr. Teddy Zhang)

13:45 – 14:30 Introduction of REFA methodology 方法介绍 (Mr. Dennis Behnke)

14:30 – 14:45 Coffee Break & Networking 茶歇与交流

14:45 – 15:30 REFA methods & How to increase productivity? 方法&如何提高生产率?(Mr. Dennis Behnke)

15:30 – 16:00 Q&A 问答环节


Target Group:

General Managers, Plant Managers, Industrial Engineers, Lean Experts, CIP Engineers, Production Manager, and/or other management representatives

总经理、工厂经理、工业工程师、精益专家、CIP工程师、生产经理和/或其他管理代表


Language: Chinese/中文


Fee: German Chamber Member: 100 RMB | Non-Member: 200 RMB


Venue:

KSD Automotive Changchun, No.1566 Qingtianshu Street, Jingyue Hi-Tech Zone, Changchun

长春科世得润汽车部件有限公司,长春市净月经济开发区擎天树街1566号


Please note:

  • Please register before April 25, 12PM! 请在4月25日中午12点前注册。
  • You are requested to bring and wear a face mask during the workshop, please prepare accordingly. 请携带口罩参加培训。
  • Electronic fapiao will be sent to your email within one week after the event. 电子发票将于活动结束后一周内发至您邮箱。

Speakers

  • Mr. Teddy Zhang (IE Supervisor at Changchun KSD Automotive Components Co., Ltd.)

    Mr. Teddy Zhang

    IE Supervisor at Changchun KSD Automotive Components Co., Ltd.

  • Mr. Dennis Behnke (REFA-Instructor & Senior Consultant at Ingenics Consulting Shanghai)

    Mr. Dennis Behnke

    REFA-Instructor & Senior Consultant at Ingenics Consulting Shanghai

Venue

KSD Automotive Changchun

长春科世得润汽车部件有限公司
长春市净月经济开发区擎天树街1566号

If you have any questions please contact Block 布鲁克 Jan Carl

Contact Organizer

+86 18640178496

Show on map